Construction waste recycling plant has a wide range of applications and has been widely praised
Do you know the steps of separation of construction waste?
Pre-selection - It is necessary to manually pre-screen and sort the waste concrete, brick and cement blocks, and pick out the wood and steel bars doped in it to avoid failure
Crushing - Because construction waste is a medium hardness material, no viscosity, there is no high requirement for water content, it is generally responsible for jaw crusher and impact crusher to treat large pieces of waste material into a variety of different specifications of stone, sand and so on.
Magnetic separation - The use of magnetic separation equipment to remove scrap metal from the finished product, if you can be sure that the material does not contain metal, this step can be omitted.
Separation - Fabric, plastic, wood scraps, etc. cannot be removed by magnetic separation, so separation equipment is required to separate these light substances for other purposes.
Sieving - The rest of the finished product is transferred.